San Lorenzo Unified School District To Save 4.5 Million with Solar Energy

The San Lorenzo Unified School District in Northern California has tapped a school modernization bond to install its first solar project. Built by Chevron Energy Solutions, a set of solar canopies in multiple parking lots throughout the district will generate 1,021 kilowatts of electricity.

The bond measure, which raised $83 million for facility additions and renovations, included funds for energy management and conservation. Besides the solar installations, the district also implemented new energy management and lighting systems in new buildings and retrofitted existing buildings. It estimates that it will save $300,000 to $400,000 per year on its annual electric bill, which has traditionally been over $700,000 a year. The project is expected to have a 12-year payback at a maximum. Over the lifespan of the project, San Lorenzo expects to save $4.5 million.

After obtaining an independent analysis of potential approaches to the solar project the district chose parking shade structures instead of rooftop units because the latter may have required "expensive" roof structure improvements and could conflict with roof repairs and future reroofing projects. According to a September 2011 presentation, the parking structures would be easier to maintain, but had to meet requirements for fire truck access.

The same analysis determined that the optimum sizing for a solar project would meet between 75 and 80 percent of the district's current energy needs. Over-sizing--generating enough power to sell back to the utility company--was considered "a very poor investment."

The district also chose to pay for the system and handle or contract out its on-going maintenance and operation rather than setting up a power purchase agreement with a third-party. In the latter scenario, a district contracts for a set price with a company that builds, owns, and operates the solar installation.

Although the district and its advisor Kenwood Energy solicited bids from several firms, only two came through with proposals. San Lorenzo chose Chevron for the project because "they have the most experience in this area," district staff explained during a school board meeting. The work was estimated to cost up to $6.5 million with about a million dollars being reimbursed through a California state solar initiative.

"This project fulfills our commitment to the voters of this community, who have consistently entrusted us with an ambitious investment in our district's facilities," said Superintendent Dennis Byas. "With the completion of our solar canopies, we have not only been able to bring our schools into the 21st century, but we have used these bond dollars in a way that will ultimately benefit our students, our teachers, and our local community."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • The AI Show

    Register for Free to Attend the World's Greatest Show for All Things AI in EDU

    The AI Show @ ASU+GSV, held April 5–7, 2025, at the San Diego Convention Center, is a free event designed to help educators, students, and parents navigate AI's role in education. Featuring hands-on workshops, AI-powered networking, live demos from 125+ EdTech exhibitors, and keynote speakers like Colin Kaepernick and Stevie Van Zandt, the event offers practical insights into AI-driven teaching, learning, and career opportunities. Attendees will gain actionable strategies to integrate AI into classrooms while exploring innovations that promote equity, accessibility, and student success.

  • Geometric illustration of colorful robotic toys with distinct features like heads, arms, wheels, and antennas on a light gradient background

    KinderLab Robotics Expands Curriculum to Serve Upper Elementary Students

    KinderLab Robotics has expanded its STEAM robotics offerings with a new curriculum to develop computational thinking and computer science skills for students in grades 3-5.

  • Stock market graphs and candlesticks breaking apart with glass-like cracks

    Chinese Startup Disrupts AI Market

    A new low-cost artificial intelligence model from China is wreaking havoc in the technology sector, with tech stocks plummeting globally as concerns grow over the potential disruption it could cause.

  • interconnected glowing nodes and circuits in blue and green, forming a neural network on a dark background with a futuristic design

    Tech Giants Launch $100 Billion National AI Infrastructure Project

    OpenAI, SoftBank, and Oracle have announced a new venture, Stargate, through which they aim to build a massive AI infrastructure network across the United States. The initiative, which was announced at the White House with President Donald Trump, has been described as the "largest AI infrastructure project in history."